Canton FairSourcing
Valves/Pipe Fittings

Carbon Steel Seamless Pipe

HEBEI SHENGTIAN GROUP SEAMLESS STEEL PIPE CO.,LTD
10/10 fairsManufacturerModel 2" * SCH40
Carbon Steel Seamless Pipe
$1,04000$1,07900/ ton FOB
MOQ 5 ton
Estimated landed cost
$1,369 / ton
range $1,344$1,394 · total ≈ $136,935
See what’s included
FOB goods (100)
$105,950
Ocean freight + handling (0.30 CBM)
$820
US duty (3.0%)
$3,179
Section 301 tariff (25.0%)
$26,488
Customs fees (MPF/HMF)
$499

Estimate in USD to a US port using category averages (HTS 7318/8302/8301), rates as of 2026-09. Other countries on request. A quote from our desk uses real carton sizes, freight and the exact tariff line.

Verify from $29 · written report in 3 business days · 100% refund if unreachable

About this product

  • Materials: CARBON STEEL
  • Size: 60.3 * 3.91
  • Color: BLACK
  • Exports to: Mainland China, Africa, Middle East, Southeast Asia, South Asia, Latin America
  • Made in: Hebei, China
Product details
MaterialsCARBON STEEL
Size60.3 * 3.91
ColorBLACK
From the supplier


PRODUCT NAMESEAMLESS STEEL PIPES/TUBESMATERIALCARBON STEELSTANDARDAPI 5L/ASTM A106/A53; GB8163; GB8162; GB3087; ASME B36.10MGRADE20#; 10#; 45#; 16Mn; GR.B; X42; X52SIZEOD: 1/4" ~ 32"
WT: STD,SCH40, SCH80, SCH160 and so on.
LENGTH: 5.8M; 6M; 11.6M;11.8M; 12M or as customer's requirement.
PRODUCTION PROCESSCOLD DRAWN/HOT ROLLED/HOT EXPANSIONAPPLICATIONlow and medium pressure-boilers, petroleum casing pipes, ships,fluid conveyance, petroleum cracking, chemical fertilizer equipments, structures and hollow pumping rods purposes.CERTIFICATEAPI 5L; ISOSURFACE TREATMENTBlack Painting; Red Painting; Varnish; Galvanize; 3PE COATINGPIPE ENDBeveled end and Plain end are both available.
Also it can be NPT thread with couplings.
PLASTIC CAPSPlastic caps at both ends to protect the ends from damage.
Cap color:blue, green, orange, white, yellow or purple.
MARKINGAll pipes will be painted the specification,standard and heat NO.
We also supply OEM service to painted customers' brand.
PACKING Packing in Bundles or PVC packing.
Strong steel bundle to make sure the safe on the shipping.
Each bundle with at least 2 white left belts.
Weight of each bundle not less than 2 tons.
DELIVERYNormally 30-50 days based on the qty during 50-1000 tons.SHIPMENTIN CONTAINER/BY BULK SHIPMENT.PAYMENT30%IN ADVANCE,THE BALANCE BEFORE SHIPMENT.
20%IN ADVANCE,THE BALANCE BY LC AT SIGHT.
100%BY LC AT SIGHT.

About the supplier

HEBEI SHENGTIAN GROUP SEAMLESS STEEL PIPE CO.,LTD

Main products: Steel pipe

  • Exhibited at 10 of the last 10 Canton Fairs
  • Manufacturer
  • Founded 1998
See all products from this supplier →
75
trust
  • Exhibited at 10 of the last 10 Canton Fairs
  • Manufacturer
  • Founded 1998
Canton Fair booth: 9.1E14 · Hardware (140th session)

Similar products from other suppliers

EMT Tubes
EMT Tubes
Price on request
MOQ 1
Carbon Steel Pipe 14" Std
Carbon Steel Pipe 14" Std
$400.00–$550.00 / ton FOB
~$618.44 landed · 100 pcs
500g/㎡ Hot dipped Galvanized Steel Round Pipe for gas
500g/㎡ Hot dipped Galvanized Steel Round Pipe for gas
$690.00–$765.00 / ton FOB
~$942.83 landed · 100 pcs
IMC Pipe
IMC Pipe
Price on request
MOQ 1
EMT Conduit
EMT Conduit
Price on request
MOQ 1
Galvanized Pipes For Gas
Galvanized Pipes For Gas
$900.00–$1,050.00 / ton FOB
~$1260.80 landed · 100 pcs
$1040.00–$1079.00 / ton
MOQ 5 · Verify for $29
Get a quote