Pp fitting

The supplier hasn’t listed a price. We can get their current prices and MOQ.
- Service
- From $29 per supplier (Verify)
- You get
- Phone and video verification, a quote sheet and a written report
- Turnaround
- 3 business days
- Contact details
- Sent to you once your request is confirmed
If we can't reach the supplier within 3 business days, we refund the fee.

Pp fitting
The supplier hasn’t listed a price. We can get their current prices and MOQ.
- Service
- From $29 per supplier (Verify)
- You get
- Phone and video verification, a quote sheet and a written report
- Turnaround
- 3 business days
- Contact details
- Sent to you once your request is confirmed
If we can't reach the supplier within 3 business days, we refund the fee.
About this product
- Materials: pp
- Size: 20-110
- Color: blue
- Exports to: Mainland China, Africa, Middle East, Southeast Asia, South Asia, Central Asia, Latin America, EU, Other European Countries, Others
- Made in: Zhejiang, China
About this product
- Materials: pp
- Size: 20-110
- Color: blue
- Exports to: Mainland China, Africa, Middle East, Southeast Asia, South Asia, Central Asia, Latin America, EU, Other European Countries, Others
- Made in: Zhejiang, China
Product details
| Materials | pp |
|---|---|
| Size | 20-110 |
| Color | blue |
From the supplier
Pp pipe installation method
1. Before the pipes, pipe fittings of adhesive, use dry cloth to bell mouth and socket lateral wipe the handle, when the surface with oil pollution must be with acetone to wipe clean.
2. The vertical axis of the tube and pipe section should level off, chamfering processing;Adhesive should draw before insert lines and try to plug, the depth of insertion depth can only be inserted into the original of 1/3 ~ 1/2, gap crossing is greater than bonding method is strictly prohibited.
3. Apply dope, should daub socket inside, the daub after jack lateral, daub should be along the axial socket from inside to outside evenly daub appropriate amount, shall not leak or apply too much (200 g/m2).
4. Dope, daub appropriate exert force unchanged within 1 minute, to keep the straight degree and location of the interface is correct.
5. After the glue in a timely manner will squeeze out the extra dope rub-up, in curing time shall not force or load by force.
6. Glue joint construction shall not be in the rain or water, not below 5 ℃.
7. The linker: ready to try to clean up the working face, inserted to brush glue, adhesive and curing.
About the supplier
Main products: Kitchen faucet,Kitchen sink,PVC pipes and pipe fittings,PPR fitting,Brass ball valve,Malleable iron pipe fitting,Steel pipe,Square bar,Galvanized corrugated steel sheet,CPVC pipes and fittings,Stainless steel tube,Other pipe fittings,Brass fittings,PTFE TAPE,Flexible,Kitchen hangs
- ✓Exhibited at 10 of the last 10 Canton Fairs
- ✓Foreign Trade Company
- ✓Founded 2000
- ✓Brand exhibitor
- ✓1 certificate on file
- Exhibited at 10 of the last 10 Canton Fairs
- Foreign Trade Company
- Founded 2000
- Brand exhibitor
Similar products from other suppliers
Add a few to compare, then request quotes from all of them at once.







