Canton FairSourcing
Visit the Weifang Henglida Steel Structure Co.,Ltd store

site camp office building

10/10 fairsManufacturerModel site camp office building
Green / low-carbon
site camp office building
$5000$10000/ square meter FOB
MOQ 200 square meter · T/T, L/C
Estimated landed cost
$101 / square meter
range $69$134 · total ≈ $20,286
FOB goods (200)
$15,000
Ocean freight + handling (2.0 CBM)
$940
US duty (3.5%)
$525
Section 301 tariff (25.0%)
$3,750
Customs fees (MPF/HMF)
$71

Estimate in USD to a US port using category averages, rates as of 2026-09. Other countries on request. A quote from our desk uses real carton sizes, freight and the exact tariff line.

Service
From $29 per supplier (Verify)
You get
Phone and video verification, a quote sheet and a written report
Turnaround
3 business days
Contact details
Sent to you once your request is confirmed

If we can't reach the supplier within 3 business days, we refund the fee.

About this product

  • Materials: steel structure
  • Made in: Shandong, China

Product details

Materialssteel structure

From the supplier

Lida Prefabricated House

 

 

 

On Line Catalogue:

PDF Catalogue: http://www.lidajituan.com/en/upload/2014/1/8182826942.pdf

LGS Villa Catalogue: http://www.lidajituan.com/en/upload/2014/1/1115150923.pdf

 

Technical Parameter:


Technical Parameter of standard prefabricated house:
1. Wind resistance: Grade 11(wind speed≤ 120km/h)
2. Earthquake resistance: Grade 7
3. Live load capacity of roofing: 0.6kn/m2
4. External and internal wall heat transmission coefficient: 0.35Kcal/m2hc
5. Second Floor Load Capacity: 150kg/m2
6. Live load of corridor is 2.0KN/ m2
7. Wall permitted loading: 0.6KN/ m2
8. Ceiling Permitted live loading: 0.5 KN/m2
9. Wall Coefficient of thermal conductivity: K=0.442W/m2k
10. Ceiling Coefficient of thermal conductivity: K=0.55W/ m2K

Steel Framework:

 


1,Main column: fabricated by 80*80 or 100*100 or 120*120 or 150*150 Square Tube, Q235 Steel  Surface working: Alkyd painting,two primary and two surface.
2, Main triangle Beam: fabricated by C80, C100, C120, C140 Section steel, Q235 Steel, Surface working: Alkyd painting, two primary and two surface.
3, Wall and roof purlin: C80, C100, C120, C140 Section steel, Q235 Steel,
4, Surface working: Galvanized

Floor:

Ground floor will be the concrete foundation with Ceramic tiles or PVC floor leather.
First floor:  18mm plywood with 2.0mm PVC floor leather for living rooms floor;  

 

Ceiling:


6mm Gypsum board for dry room
12mm PVC ceiling for wet room

Walls:

 

Insulated Steel Sandwich Panel wall
Panel width: 950mm;
Thickness: 50-150mm.
Powder coated Color steel on both sides: 0.4mm/0.5mm/0.6mm
Insulation: Polystyrene, Rockwool or Polyurethane
Density of Rockwool: 120Kg/m3
Density of Polystyrene: 12Kg/m3, 16Kg/m3 20Kg/m3
Density of Polyurethane: 40Kg/m3

Door:

 
External door: Insulated with opening dimension 950*2100mm, furnished with lock
with 3keys. Inner door: Insulated steel door.

Windows:

Window material: PVC window with fly screen, 4mm glass.

Electrical fittings option:

Electrical wire, 2.5mm2 for lighting system, and 4mm2 for AC units.
16A five holes universal socket.
double tube fluorescent lamp, 220V,50-60HZ
Single Switch, Honyar brand, with junction box
Electrical distribution box, box + breakers + earth leakage protective device

Optional Water system fittings:


Water drain pipe, PPR pipe, dim 16-20mm, connection fittings are made of copper, life span over 10 years.
Exhaust fan or air exchange hole, size 250mm*250mm made of steel or PVC

Sanitary ware:


Western Close tool: ceramic, with pipes and installation fittings
Urinal: ceramic, with pipes and installation fittings
Wash basin: ceramic, with post, faucet, pipes and installation fittings
Shower head, Shower base, Water mixture

Finished Projects:

 

 

 

Packaging & Shipping

Loading & Transport:

  • Container loading
  • Flat package loading as the pictures show bellow

 

  

 

Our Services

1. Professional design and engineering team:

    Full solution for site camp design. We could make the design for whole camp as per your requirement.  

 

 2. Procurement and Manufacture for all material for prefabricated building: 

    We have a professional procurement team to make sure all the materials are with good quality. And our factory operation under ISO standard, to make sure the fabrication works with high technology.

 

3. Site management & Installation supervision:

    We could send our engineers to help for the installation supervision, you just need to prepare a team which know normal construction works will be OK.

Service Network:


 

 

Company Information

Our big company family:

 

 

 

Our company information:

 

I am proud to introduce my company to you.Our Weifang Henglida Steel Structure Co., Ltd. (Lida Group) is one of the largest manufacturers of the prefabricated house, Flat Pack container house, steel villas, and steel structure warehouse in China. We have been doing well in this field for more than 20 years, with best quality, best service and competitive price, and we are 8thyears Alibaba Gold Supplier and we have exported our products to more than 96 countries as well as our domestic market with ISO9001, CE and SGS approval.

 

750 employees,among which we have 50 engineers and 200 workers in charge of supervising overseas projects.

73,000 square meters of factory space.

3 production lines for our prefabricated house series.

3 production lines for coantier house series.

2 production lines for our steel structure warehouse/workshop series.

1 production line for our light steel villa series overseas branch office in Saudi Arabia,Italy,Russia and Angola.

 

Workshop and Facility:

 

 

Certifications:

CE, BV, SGS, ISO9001:2008 certifications


 

FAQ

Why Choose Prefabricated house for Site Camp Solution?

 There are many advantages to prefabricated house for site camps including:

1. Speed of construction and camp installation: Allows for the building and the site work to be completed simultaneously, reducing the overall completion schedule, all the Main Structures will be connect with bolts, no welding works. All the wall and roof structure, flooring will be fixed by self-tapping screw or nails, normal carpenter team could make a good job!

2. Economical Solution: Compare to concrete building, prefabricated building will be much more Economical

3. Ability to service remote locations: Assembling a work camp close to the work site reduces travel time which reduces cost.

4. Long time span: Well-built modular worker camps can last for 10, 15 or 20 years or more.

5. Safe and stable, Earthquake resistance: Grade 7, Wind resistance: Grade 11(wind speed≤ 120km/h).

Thanks for your attention! Any more questions, please don't be hesitant to contact me.Best regards and wish you a nice day!


About the supplier

Weifang Henglida Steel Structure Co.,Ltd

Main products: prefab house

  • Exhibited at 10 of the last 10 Canton Fairs
  • Manufacturer
  • Founded 2004
  • Canton Fair Premium Supplier
  • National high-tech enterprise
See all products from this supplier →
Supplier
Weifang Henglida Steel Structure Co.,Ltd
Weifang, Shandong, China
85
trust
  • Exhibited at 10 of the last 10 Canton Fairs
  • Manufacturer
  • Founded 2004
  • Canton Fair Premium Supplier
Canton Fair booth: 11.2K1 · Building and Decorative Materials (140th session)

Similar products from other suppliers

Add a few to compare, then request quotes from all of them at once.

Small but Big Moveable Vacation Prefab House
Small but Big Moveable Vacation Prefab House
$21,000.00–$30,000.00 / unit FOB
~$32813.92 landed · 100 pcs
WZH -1 20 ft expandable container house
WZH -1 20 ft expandable container house
$5,800.00–$8,500.00 / set FOB
~$9211.23 landed · 100 pcs
steel structure building
steel structure building
$30.00–$70.00 / square meter FOB
~$72.84 landed · 100 pcs
WZH-3 Flat Pack Container House with sunshade(
WZH-3 Flat Pack Container House with sunshade(
$4,500.00–$5,000.00 / set FOB
~$6124.23 landed · 100 pcs
$50.00–$100.00 / square meter
MOQ 200 · Verify for $29
Get a quote