Early stripping Slab formwork system (T-form)

The supplier hasn’t listed a price. We can get their current prices and MOQ.
- Service
- From $29 per supplier (Verify)
- You get
- Phone and video verification, a quote sheet and a written report
- Turnaround
- 3 business days
- Contact details
- Sent to you once your request is confirmed
If we can't reach the supplier within 3 business days, we refund the fee.

Early stripping Slab formwork system (T-form)
The supplier hasn’t listed a price. We can get their current prices and MOQ.
- Service
- From $29 per supplier (Verify)
- You get
- Phone and video verification, a quote sheet and a written report
- Turnaround
- 3 business days
- Contact details
- Sent to you once your request is confirmed
If we can't reach the supplier within 3 business days, we refund the fee.
About this product
- Materials: Steel frame with plywood
- Exports to: Africa, Middle East, Southeast Asia, South Asia, Latin America
- Made in: Hunan, China
About this product
- Materials: Steel frame with plywood
- Exports to: Africa, Middle East, Southeast Asia, South Asia, Latin America
- Made in: Hunan, China
Product details
| Materials | Steel frame with plywood |
|---|
From the supplier
T-Form slab formwork system
* Shortage skilled labour?
* Long time contruction period?
* Difficult to reusable for next project?
* So much disposable waste?
* Financial pressure?
T-form slab formwork system can help you solve these trouble.
More Quickly:
- Quickly erection and dismantlement rate up to 100 m2 slab formowrk per person every day.
- efficient solutions for infill zones, beams, shear wall and dropping slab area.
- minimal need for craneage during set-up and transfer.
More Safety:
- high strength ability panel.
- Self lock clamp
- pre-designed panel layout ensures every panel is put up correctly
More Simplicity:
- Only hammer be required in operation.
- Manual erection and movement, minimal crane required
- Simple infill component is needed to fill the gap zone
- Easy to train and work with
- Multipurpose accessories
Hand-held design
Largest size panel 1800 x 1200mm only 44kg.
Only Panel & Prop
- No deck beam design, easy to be managed, storage, repair and seach.
- Minimal prop and panel numbers, more clean, more wide working space.
- Speed working: quickly erection and dismantle, time-saving infill solution for joint wall & column, drop area, beam and cantilever solution.
Much less cran-time be needed
- Working can move ahead rapidly, independently and without interruption even when the crane is fully occupied. The crane is no longer a 'chorke point' duiing formwork setup.
Standardized panel for various structure building
- All formwork component can be reusable on different project.
Formwork panel size:
Super fast erection
Early stripping design
The formwork panel can be dismentle when concrete solidification to 50% (keep supporter). Only 1 set formwork panel is equal to 2 to 3 sets conventional formwork.
Packaging & Shipping
Bundling by plastic belt on steel pallet. Easy to move and sea worthy transport.
Our Services
Experienced engineer team help you make professional construction plan and proposal
We are not only manufacturer but also is integral solution supplier.
About the supplier
Main products: Landing stage of scaffold, Film Faced Plywood, Wedge joint board /laminated wood, Melamine slot board, PVC Foam Board, Chipboard, Wooden planks, Sandwich panel, Fiberboard/density board, Plywood, Stainless steel castings, Stainless Steel Tube, Galvanized steel coil, Cold rolled steel plate, prefab house, Pipe fittings, Camlock coupling, Equal elbow, Shade net
- ✓Exhibited at 10 of the last 10 Canton Fairs
- ✓Foreign Trade Company
- ✓Founded 2005
- ✓Brand exhibitor
- Exhibited at 10 of the last 10 Canton Fairs
- Foreign Trade Company
- Founded 2005
- Brand exhibitor
Similar products from other suppliers
Add a few to compare, then request quotes from all of them at once.







